Enlargement of an industrial building
Lucca, Italy
2011
The intervention concerns the raising of the shed for the part destined to warehouse to allow the installation of a new bridge crane larger than the existing one.
The project involved the dismantling of the existing roofing in prefabricated tiles and the underlying glazing strip, with the maintenance of the reinforced concrete pillar structure. and all the perimeter walls.
A new metal structure has been positioned above the existing one
and buffered with coextruded polycarbonate panels.



client: Echo 1
architectural design:
Quattroassociati






